CORE MPO header
www.corempo.org       
US 80 logo head
The design alternatives in the US 80 Bridges Study are now available on the web.
 

 

US 80 Bridges Replacement Study

The US 80 Bridges Replacement Study is an initiative of the Coastal Region MPO in coordination with the Chatham County-Savannah Metropolitan Planning Commission (MPC) to identify feasible solutions for safety and access issues on the Bull River and Lazaretto Creek Bridges, as well as for flooding issues on US 80 between the bridges.

The study will determine the feasibility of:

  • Replacing or modifying the existing bridges to accommodate wider lanes and shoulder,
  • Constructing bicycle and pedestrian facilities that link to Tybee Island and McQueen’s Island Trail,
  • Providing additional capacity at specific locations to provide congestion or incident relief,
  • Improving conditions of flood prone areas.

Project Team

Emily Ritzler, Project Manager
CDM Smith
678-244-0274
ritzleree@cdmsmith.com

Jane Love, Project Manager
Metropolitan Planning Commission
912-651-1443
lovej@thempc.org

Back to MPC Transportation Services page...


 

Trail picture

Lazaretto Bridge picture

 

ARRA logo

 
Copyright © 2004, The Chatham County - Savannah Metropolitan Planning Commission. All rights are reserved.
Please read Privacy Policy and User Agreement