US 80 Bridges Replacement Study
Public Partcipation
September 15 & 16, 2010 -- First Round Meetings: Stakeholders and Public
In the first round of meetings, we explained the background and objectives of the study and sought input on issues.
Meeting #1 Presentation
Meeting #1 Questionnaire
March 8, 2011 -- Second Round Meetings:
Stakeholders and Public
The purpose of the second round of meetings was to present various alternatives and obtain feedback.
Meeting #2 Presentation
Meeting #2 Questionnaire
August 29 & 30, 2011 -- Third Round Meetings:
Stakeholders and Public
The purpose of the third round of stakeholder and public meetings (listed above) was to reivew the evaluation of the the six end-to-end alternatives. During and for a couple weeks after the public meeting, members of the public had the opportunity provide their own ranking of the alternatives.
Stakeholder Meeting #3 Presentation
Public Meeting Materials
The information shared at the third public meeting is posted below. For each alternative, close-up images of the key elements are provided for detail. All alternatives propose the same solution at the entrance to Fort Pulaski on US 80, and therefore that image is listed once below.
Summary of Results of Previous Public Input
Evaluation Matrix Comparing Alternatives
The "No Build" alternative and the previous GDOT 4-lane concept are included in the evaluation, along with the six alternatives below. The GDOT concept will not be a recommendation of this study because the intent of the study was to identify a more easily implementable alternative. It is inclulded in the comparison for reference.
Fort Pulaski Entrance Detail (included in all six alternatives)
Alternative 1 End-to-End
Alternative 1 Bull River Bridge Detail
Alternative 1 Lazaretto Creek Bridge Detail
Alternative 1 Trailhead Entrance Detail
Alternative 2 End-to-End
Alternative 2 Bull River Bridge Detail
Alternative 2 Lazaretto Creek Bridge Detail
Alternative 2 Trailhead Entrance Detail
Alternative 3 End-to-End
Alternative 3 Bull River Bridge Detail
Alternative 3 Lazaretto Creek Bridge Detail
Alternative 3 Trailhead Entrance Detail
Alternative 4 End-to-End
Alternative 4 Bull River Bridge Detail
Alternative 4 Lazaretto Creek Bridge Detail
Alternative 4 Trailhead Entrance Detail
Alternative 5 End-to-End
Alternative 5 Bull River Bridge Detail
Alternative 5 Lazaretto Creek Bridge Detail
Alternative 5 Trailhead Entrance Detail
Alternative 6 End-to-End
Alternative 6 Bull River Bridge Detail
Alternative 6 Lazaretto Creek Bridge Detail
Alternative 6 Trailhead Entrance Detail
Contact Information
Melvin Brown, Project Manager
Wilbur Smith Associates
770-936-8650
mbrown@wilbursmith.com
Jane Love, Project Manager
Metropolitan Planning Commission
912-651-1443
lovej@thempc.org