SR 25 US 17 Corridor Study

Chatham County, in cooperation with the Coastal Region Metropolitan Planning Organization (CORE MPO), has undertaken the SR 25/US 17 Corridor Study (PI No. 0019011). This study identifies and prioritizes short-term (0-5 years) and long-term (5+ years) improvement projects needed for the SR 25/US 17/Ogeechee Road corridor to address future travel demands, safety, and accessibility for all users including motorists, pedestrians, cyclists, and transit users.

The study results in a prioritized list of recommendations to facilitate the planning and programming of projects through the CORE MPO’s Metropolitan Transportation Plan (MTP) process. The study helps to justify the future programming of projects in the CORE MPO’s Transportation Improvement Program (TIP) and Moving Forward Together 2050 Plan. This step is required to advance projects into design and construction.

The study kicked off in December 2023 and was completed in May 2025. The study deliverables are shown below.